Our Services

Plumbing

Plan plumbing around the way your building will be used. Zeus Metalworks coordinates plumbing work for metal-building projects, from underground rough-in to water lines, drainage, and fixture connections.
Plumber installing brass fittings in PVC

Practical plumbing starts with a clear plan.

Plumbing decisions belong early in the building process. Fixture locations, underground piping, and connections through the foundation affect the work that follows, making coordination essential before concrete is placed.

Zeus Metalworks helps integrate plumbing into your metal-building project. The scope is developed around the building’s intended use, planned fixtures, available utility connections, and applicable project requirements.

From underground rough-in through final connections, plumbing work is coordinated with the foundation, framing, and interior layout. We’ll discuss what your project needs and define the work included in your estimate.

What's Included

Layout & Project Coordination

Coordinate planned fixture locations, piping routes, and connection points with the building layout before foundation and interior work proceed.

Underground Rough-In

Install specified underground plumbing within the agreed scope, coordinating pipe locations and elevations with the foundation plans before concrete placement.

Water Supply Lines

Route water supply piping to planned fixtures and equipment connections, with materials and sizing determined by the project requirements.

Drain, Waste & Vent Piping

Install drain, waste, and vent piping for the planned plumbing layout, coordinating routes with structural elements and other building systems.

Fixture Connections

Connect specified sinks, toilets, and other agreed fixtures as the building reaches the appropriate stage of completion.

Testing & Inspection Coordination

Coordinate required plumbing tests and inspections before piping is concealed and as work progresses toward completion.

Let’s talk about what you want to build.