Our Services

Spray Foam

Plan insulation around your building’s intended use. Zeus Metalworks coordinates spray foam insulation for metal-building projects, with application areas and specifications defined around the building design.
Worker in PPG spraying foam Insulation

Make insulation part of the building plan.

How you plan to use your metal building helps determine its insulation needs. A workshop, storage building, and conditioned interior can each call for a different approach to the building envelope.

Zeus Metalworks coordinates spray foam insulation with the requirements of your project. Application areas, product selection, and specified thickness are established around the building assembly, intended use, and manufacturer’s installation requirements.

Insulation work is scheduled alongside electrical, plumbing, and interior construction so the necessary rough-in work is complete before application. We’ll discuss the proposed scope with you, including surface preparation, application access, and any required protective coverings.

What's Included

Project & Application Review

Review the building’s intended use, planned insulation areas, and construction details to establish the proposed application scope.

Product & Specification Coordination

Coordinate the specified foam product, application thickness, and assembly requirements with the project plans and manufacturer’s guidance.

Surface Preparation

Prepare designated application areas according to the product requirements, addressing access, surface condition, and readiness before spraying begins.

Masking & Area Protection

Protect designated adjacent surfaces, fixtures, and equipment, and establish the application work area before installation.

Spray Foam Application

Apply the specified spray foam to agreed areas of the building, following the product’s installation requirements and project specifications.

Completion & Trade Coordination

Review the completed application against the agreed scope and coordinate subsequent work, including any specified protective coverings and manufacturer-directed re-entry requirements.

Let’s talk about what you want to build.